- The name of the old closed model portfolio you want to switch out of.
 - The name of the open portfolio. The portfolio must already be set up on the system.
 - A list of the clients’ accounts you’d like to switch into the model portfolio.
 - You’ll need to know whether you want to redirect any ongoing contributions into the model portfolio, as well as switching existing holdings.
 
Read time: 2 minutes